| | I have a 24' run of track with with 10 track heads at 76 watts per head on it.
City code requires I take the most of either : The total linear feet of track times 33w, or the total number of watts per track heads. if I have varying degrees of track lengths and track heads throughout the room, how long can I spend working on the project before I realize I'm out of coffee and leave to go get some more? |
| | Posted 1/23/2009 11:40 AM - 1 View - 0 eProps - 0 comments
- recommend
    - recs0
- share
- email
 - sent0
Give eProps or Post a Comment |